FABOOL Laser CO2(2019~) Manual

XY-axis Accessories Installation

No. Parts Name Notes Pictures Qty
54 Carrier Mount x-axis   2
55 Carrier Mount y-axis   2
53 Limit Mount   3
52 Limit Mount y1   1
23 Cable Carrier x-axis   1
24 Cable Carrier y-axis   2
84 M5x6 Low Head Screw   16
102 M4x10 Hex Socket Countersunk Head Cap Screw   12
114 M4 Nut   4

Assembly Procedure

Limit Mount Installation

13-01.jpg

Attach 2 [53] Limit Mounts on the front side of [1] V-slot 848mm with 4 [84] M5x6 Low Head Screws and 4 [30] M5 Pre-Assembly Nuts inserted in advance.Leave a Nut on the left. Make sure that [53] Limit Mounts are facing the right direction. Install the [53] Limit Mounts roughly in the position shown in the picture since you will adjust the position later on.

13-02.jpg 13-03.jpg

Attach [53] Limit Mount on the [1] V-slot 780mm on the right-middle side of the main body frame with 2 [84] M5x6 Low Head Screws and 2 [30] M5 Pre-Assembly Nuts inserted in advance. Make sure that the [53] Limit Mount is facing the right direction.

13-04.jpg

Attach [52] Limit Mount y1 on the [6] 800mm Aluminum Frame 20*20mm on the right-top side of the main body frame with 2 [84] M5x6 Low Head Screws and 2 [30] M5 Pre-Assembly Nuts inserted in advance.

13-05.jpg

Cable Carrier Installation Bracket Removal

Detach the Cable Carrier Installation Brackets installed on either ends of [23] Cable Carrier x-axis and [24] Cable Carrier y-axis. Use flat-bladed screwdriver for easy removal.

13-06.jpg

Work with care not to be injured when you handle the flat-bladed screwdriver.

13-07.jpg

Cable Carrier Installation Brackets have 2 kinds; Male parts and Female parts. Pay attention and try not to use the wrong one.

13-08.jpg 13-09.jpg 13-10.jpg 13-11.jpg

Carrier Mount x-axis Installation

Attach [54] Carrier Mount x-axis on the [34] Wheel Plate y-axis with 2 [84] M5x6 Low Head Screws.

13-12.jpg 13-13.jpg

Attach [54] Carrier Mount x-axis on the backside of [1] V-slot 848mm with 2 [84] M5x6 Low Head Screws and 2 [30] M5 Pre-Assembly Nuts inserted in advance. Install [54] Carrier Mount x-axis on the middle of the main body frame.

13-14.jpg 13-15.jpg

Attach the female part of the Cable Carrier x-axis Installation Bracket with 2 [102] M4x10 Hex Socket Countersunk Head Cap Screws and 2 [114] M4 Nuts.

13-16.jpg

Attach the male part of the Cable Carrier x-axis Installation Bracket with 2 [102] M4x10 Hex Socket Countersunk Head Cap Screws and 2 [114] M4 Nuts.

13-17.jpg 13-18.jpg

Carrier Mount y-axis Installation

Attach the female part of the Cable Carrier y-axis Installation Bracket on the [55] Carrier Mount y-axis with 2 [102] M4x10 Hex Socket Countersunk Head Cap Screws.

13-19.jpg

Assemble 2 sets to make them symmetry.

13-20.jpg 13-21.jpg

Attach [55] Carrier Mount y-axis on the [35] Wheel Plate y-axis with 2 [84] M5x6 Low Head Screws. Refer to the picture for the direction of installation of the parts.

13-22.jpg

Likewise on the opposite side, attach [55] Carrier Mount y-axis with 2 [84] M5x6 Low Head Screws. Refer to the picture for the direction of installation of the parts.

13-23.jpg

Attach the male part of the Cable Carrier y-axis Installation Bracket on [3] 860mm Aluminum Frame 20*40mm with 2 [102] M4x10 Hex Socket Countersunk Head Cap Screws and 2 [114] M4 Nuts inserted in advance.

13-24.jpg

Adjust the position of upper/ bottom Cable Carrier Installation Brackets so as to be alligned as a straight line and attach them.

13-25.jpg

Attach the male part of the Cable Carrier y-axis Installation Bracket on [3] 860mm Aluminum Frame 20*40mm with 2 [114] M4 Nuts inserted in advance and 2 [102] M4x10 Hex Socket Countersunk Head Cap Screws.

13-26.jpg

Adjust the position of upper/ bottom Cable Carrier Installation Brackets so as to be alligned as a straight line and attach them.

13-27.jpg
Top