No. Parts Name Notes Pictures Qty
127 top cover   2
5 810mm Aluminum Frame 20*20mm   2
8 529mm Aluminum Frame 20*20mm   3
29 Right-Angle Bracket   6
31 M5x8 Hex Socket Head Cap Screw   12
85 M5x8 Low Head Screw   6
30 M5 Pre-Assembly Nut   26
87 M5x25 Low Head Screw   4
105 M5x12 Hex Socket Head Cap Screw   2
104 M5x8 Hex Socket Countersunk Head Cap Screw   4
117 M5 Washers   4
37 Gas Spring   2
41 Handle   1
100 M3x12 Hex Socket Head Cap Screw   2
89 M3 Post-Assembly Nut   2
Magnet   2

Assembly Procedure

Top Cover Assembly

Attach 2 [29] Right-Angle Brackets on the either end of the [8] 529mm Aluminum Frame 20*20mm 4 [30] M5 Pre-Assembly Nuts and 4 [31] M5x8 Hex Socket Head Cap Screws.

22-01.jpg

Attach onto the other 2 pieces of the frame similarly.

22-02.jpg

Insert and attach 3 [8] 529mm Aluminum Frame 20*20mm on the [5] 810mm Aluminum Frame 20*20mm. Tack [8] 529mm Aluminum Frame 20*20mm located in the middle since position of that will be adjusted in the after process.

22-03.jpg

Insert a [30] M5 Pre-Assembly Nut each in the outside surface of [8] 529mm Aluminum Frame 20*20mm.

22-04.jpg 22-05.jpg

Attach [5] 810mm Aluminum Frame 20*20mm.

22-06.jpg

Tack the hinges, installed on the main body frame in advance, with 4 [30] M5 Pre-Assembly Nuts and 4 [31] M5x8 Hex Socket Head Cap Screws.

22-07.jpg 22-08.jpg

Referring to the picture, slide the hinge parts and attach on the outside surface of [5] 810mm Aluminum Frame 20*20mm.

22-09.jpg

Adjust the frame so as to make it to be located in the middle and fix it with screws.

22-10.jpg

Gas Spring Installation

Referring to the picture, put [87] M5x25 Low Head Screw, [117] M5 Washers and [37] Gas Spring.

22-11.jpg

Attach the [37] Gas Spring on the top part of the main body frame with [30] M5 Pre-Assembly Nut installed in advance.

22-12.jpg

As for the installation position on the main body frame side, refer to the picture and fix it in the position 70mm apart from the frame.

22-13.jpg

Fix the opposite side of the [37] Gas Spring on the top cover frame with [87] M5x25 Low Head Screws and [117] M5 Washers.

22-14.jpg

As for the installation position on the main body frame side, refer to the picture and fix it in the position 180mm apart from the frame.

22-15.jpg

Re-adjust the positon of [37] Gas Spring if the door doesn’t close like shown in the picture.

22-16.jpg

Top Cover Installation

Insert 4 [30] M5 Pre-Assembly Nuts in the backside of the [6] 810mm Aluminum Frame 20*20mm on [127] top cover.

22-17.jpg

Insert 4 [30] M5 Pre-Assembly Nuts in the frontside of the [6] 810mm Aluminum Frame 20*20mm on [127] top cover.

22-18.jpg

Place 2 [127] top covers and move 8 [30] M5 Pre-Assembly Nuts to the position of the holes.

22-19.jpg

Use 6 [85] M5x8 Low Head Screws to fix the parts except for 2 spots in the front-middle side.

* Try not to tighten the screw too much since the top cover can be broken.

22-20.jpg

Attach the handle with 2 [105] M5x12 Hex Socket Head Cap Screws.

22-21.jpg

Adjust the Aluminum Frame tacked in the middle of top cover to the middle of the handle and fix it.

22-22.jpg

Magnet Installation

Referring to the position in the picture, attach the magnet with [100] M3x12 Hex Socket Head Cap Screw and [89] M3 Post-Assembly Nut.

22-23.jpg

Adjust the magnet so as to make the distance between the magnet and the Door switch on the [80] Switch Cable becomes minimum.

22-24.jpg

Referring to the position in the picture, attach the magnet with [100] M3x12 Hex Socket Head Cap Screw and [89] M3 Post-Assembly Nut.

22-25.jpg

Adjust the magnet so as to make the distance between the magnet and the Magnet switch on the [76] Laser Cable becomes minimum.

22-26.jpg